Search |

Add/Edit My Facility

CTCR Core Facility at UD

University of Delaware

105 The Green

007 WOLF HALL

Newark, DE 19716

United States of America

http://www1.udel.edu/ctcr/ctcr-core-facility

cite this facility

Primary Contact:

Benjamin Rohe

Last Updated: 07/19/2018

Facility Details

The Center for Translational Cancer Research Core Facility is a multi-user facility, with equipment located in Wolf Hall and the Helen F. Graham Cancer Center. Available equipment include an ABI 7000 and 7300 Prism real-time PCR, IVIS Lumina System imager, and BD FACSCalibur, FACSAria II flow cytometers (located at Graham cancer Center) as well an AlphaImager gel documentation system and FluorchemQ chemi-Imager. The facility also has a Glomax Multi-modal plate reader that allows for measuring luminescence, fluorescence and absorbance and several equipment for sample preparation: microcentrifuges, scales, ph meter, spectrophotometer etc. Facilities are available to university researchers, their collaborators and industry on a fee-for-service basis.

Facility Policies

Services are offerred outside of University of Delaware

Consulting is offerred outside of University of Delaware